● Quote within 48 hours · Private and businessCall 085 333 4483
Building engineering firm in Delft

From idea to permit. Drawn, calculated, arranged.

Building drawings, planning permits, structural calculations and design, by one small firm. You talk directly to the engineer who works on your project.

Quote within 48 hoursOne point of contactServices available separately
Sheet 03 — Who we work for

For homeowners and for the building trade

The same expertise, tailored to what you need.

Homeowners

You want to renovate or extend

We make sure your plan is right on paper, gets through the municipality and can be built by any contractor.

  • Dormer or roof extensionMore space and light in the attic
  • Rear or side extensionA larger living room or kitchen
  • Removing a load-bearing wallAn open layout, structurally safe
  • Raising the roof ridgeA full extra storey
  • Outbuilding or garden roomPermit-free where possible
Quote for homeowners
Business

You build, develop or manage property

Fast turnaround, one point of contact and documents that work on site and at the municipality.

  • ContractorsStructural calculations and working drawings
  • Property developersDesign, feasibility and permits
  • Property ownersRenovation, conversion and change of use
  • Builders and designersOutsourcing drawing and calculation work
Quote for businesses
Sheet 04 — Approach

Four steps to a complete application

Clear upfront, no surprises afterwards.

01

Introduction

Call, message or fill in the form. Feel free to send photos or a sketch. You will have a quote within 48 hours.

02

Survey

We map the existing situation: on site, or from existing drawings and photos.

03

Drawing and calculating

We work your plan out into drawings and calculations. You see a draft first and give feedback.

04

Application

We submit the permit application and answer the municipality's questions until the decision is made.

Sheet 05 — Cost

What determines the price?

Every project is different. That is why we don't use standard prices that turn out wrong afterwards. These are the four things that make the difference.

Request a quote
01

Size and complexity

A dormer is less work than a renovation across two floors.

02

Existing drawings

Are there usable drawings of the current situation? That saves time.

03

Permit needed or not

An application needs extra documents and contact with the municipality.

04

Structural changes

If you change load-bearing parts, a structural calculation is needed.

How we work: you always receive a tailored quote first. We only start once you agree.
Sheet 06 — About

Small firm, direct contact

Lite Project Engineering is a building engineering firm in Delft. Being small is a choice: from start to finish you deal with the same person, who draws your project, calculates it and submits the application.

The Lite in our name is how we work: easy to reach, clear agreements, no unnecessary overhead.

OfficeDelft
ContactThe engineer, directly
ServicesDrawings, permits, structure, design
ClientsPrivate and business
ResponseQuote within 48 hours
Sheet 07 — Questions

Frequently asked questions

Is your question not listed? Call us or send a message.

Do I need a permit for my dormer or extension?

That depends on the location, the dimensions and your municipality's rules. Many rear extensions and dormers are permit-free under certain conditions, but the municipal environment plan (omgevingsplan) can add extra rules. We check it for your address before you spend any money.

How long does a permit application take?

Under the regular procedure, the municipality decides within 8 weeks of receiving a complete application. It may extend this once by 6 weeks. A complete application avoids delays caused by requests for extra documents.

What does a building drawing or structural calculation cost?

That depends on the size of the project, whether drawings already exist, whether a permit is needed and whether you change the load-bearing structure. That is why you always get a tailored quote first, within 48 hours.

Can I order just one service?

Yes. You can order only drawings, only a calculation or only the permit application. Or leave everything to us, so you have one point of contact for the whole process.

Do you also work for contractors and developers?

Yes. Contractors hire us for structural calculations and working drawings; developers and property owners for design, feasibility and permits.

Do you submit the permit application as well?

Yes. With your authorisation we submit the application through the national Omgevingsloket portal and answer the municipality's questions while it is being assessed.

What do you need from me to get started?

The project address, a short description of your plan and, if you have them, photos and existing drawings. A sketch on paper is fine too.

Next step

Ready to put your plan on paper?

Tell us briefly what you have in mind. You will have a quote within 48 hours, with no obligation.